首页> 外文期刊>Energy Reports >Research paper Consumers’ willingness to pay for electricity service attributes: A discrete choice experiment in urban Indonesia
【24h】

Research paper Consumers’ willingness to pay for electricity service attributes: A discrete choice experiment in urban Indonesia

机译:研究纸张消费者支付电力服务的意愿:印度尼西亚城市的离散选择实验

获取原文
获取外文期刊封面目录资料

摘要

In developing countries like Indonesia, the challenge of providing electricity services is often about how to combine commercial and development objectives optimally. In this context, good knowledge of consumers’ willingness to pay (WTP) and trade-offs among electricity service attributes is of strategic value, especially when achieving development objectives involve raising electricity tariffs to consumers. This study uses a discrete choice experiment (DCE) and two estimation methods, mixed logit (MXL) and latent class logit (LCL), in order to better understand the preferences of electricity customers. Specifically, the objective of the experiment is to understand how consumers balance the trade-off among four electricity service attributes: the duration of the outage, source of electricity generated, rural electrification ratio, and tariffs. The DCE survey was conducted in Bandung (Indonesia) with 1600 questionnaires were distributed. The analysis demonstrates that consumers are willing to pay for the proposed condition, away from status-quo. For example, using MXL method to reduce the outage duration to be 2 hours/year, the WTP is ranging from IDR5,000 (USD1.18) to IDR61,500 (USD14.49) per month, depending on the size of the installed capacity. While for the increase of rural electrification ratio to 100%, it ranges from IDR17,600 (USD4.15) to IDR215,000 (USD50.64) per month. The analysis emphasizes that there is significant heterogeneity in preferences for electricity service attributes.
机译:在印度尼西亚这样的发展中国家,提供电力服务的挑战通常是如何最佳地结合商业和发展目标。在这种情况下,对消费者支付的良好知识(WTP)和电力服务属性之间的权衡是战略价值,特别是在实现发展目标时涉及向消费者提高电费。本研究使用离散选择实验(DCE)和两个估计方法,混合Logit(MXL)和潜在类Logit(LCL),以更好地了解电力客户的偏好。具体而言,实验的目的是了解消费者如何在四个电力服务属性之间平衡权衡:中断的持续时间,产生的电源,农村电气化比率和关税。 DCE调查在万隆(印度尼西亚)进行了1600份问卷。分析表明,消费者愿意支付拟议的条件,远离地位。例如,使用MXL方法将中断持续时间降低为2小时/年,因此WTP从IDR5,000(USD1.18)到每月IDR61,500(USD14.49),具体取决于安装的大小容量。虽然用于将农村电气化比率提高到100%,但它根据每月IDR17,600(USD4.15)到IDR215,000(USD50.64)。分析强调,在电力服务属性的偏好中存在显着的异质性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号