首页> 外文期刊>Archives of mining sciences >Reliability Analysis of a Fleet of Loaders in Sangan Iron Mine
【24h】

Reliability Analysis of a Fleet of Loaders in Sangan Iron Mine

机译:Sangan Iron Mine装载机队的可靠性分析

获取原文
           

摘要

As the size and complexity of open pit mining equipment continue to increase, the implications of equipment failure become ever more critical. Unplanned equipment failures and their consequences have significant influence on the total operating cost of a mining system. Keeping this in view, a reliability study has been performed for a fleet of loaders in Sangan iron mine of Iran. In this study, two approaches were considered for analyze maintenance data, namely a basic maintenance approach and a reliability based approach. In this paper, trend and serial correlation test were used to validate the assumption of independent and identically distribution. K-S test was carried out with the aid of Easy-Fit software to select best fit distribution. Finally, reliability the loaders 560 No. 1, 560 No. 2 and 4400 for the next 50 hours of operation have been predicted, 5.1×10-3, 8.3×10-3 and 1.2×10-4, respectively. To achieving the high reliability a review on maintenance program must be performed.
机译:随着露天采矿设备的尺寸和复杂性继续增加,设备故障的影响变得更加重要。无计计划的设备故障及其后果对采矿系统的总运营成本产生了重大影响。保持这种看法,在伊朗的Sangan Iron Mine队列的装载机队进行了可靠性研究。在这项研究中,考虑了两种方法进行分析维护数据,即基于基础维护方法和基于可靠性的方法。在本文中,使用趋势和串联相关试验来验证独立和相同分布的假设。借助于易于拟合软件进行K-S测试,以选择最佳配合分布。最后,已经预测了接下来的50小时的装载机560号,560号和4400的可靠性已经预测,分别为5.1×10-3,8.3×10-3和1.2×10-4。为了实现高可靠性,必须执行对维护程序的审查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号