首页> 外文期刊>Archives of civil engineering >Significance Risks Evaluation of Commercial Construction Projects
【24h】

Significance Risks Evaluation of Commercial Construction Projects

机译:商业建设项目的意义风险评价

获取原文
           

摘要

The main objective of the article is to present quantified and measurable risks likelihood appearance, impact and significance of inspected and monitored 48 commercial construction projects and their feasibility to be carried out. Original technical, financial and organisational feasibility studies in compliance with a rigorous Bank Investment Supervision requirements have been executed by the author in the period of 2005 a?? 2018. Methodology of construction project appraisal for financing and execution professional preparation have been laid out a?? technical documentation, arrangements, realisation. Analysis and assessment of Bank Investment Supervision consisted of project execution plan PEP, geotechnical and environmental conditions, permit design, agreements and decision impacts of local authorities, engineering contract for construction works, project insurance and performance bonds, schedule of execution tasks and their costs, payment plan, investment budget and project economical effectiveness, scope of monthly construction works execution assessed by Earned Value Method approach and handover procedure of construction project. An attempt was made to express numerically the relationship between risks impacts and their level of likelihood. Also, a method of associating the influence of projects risks impacts on the extent of the likelihood of project risk occurrence which makes possible to determine the direction and the strength of this relationship was presented. Finally, risks likelihood appearance, impact and significance variability of commercial construction projects within last two years of booming investment industry have been determined.
机译:本文的主要目的是呈现量化和可衡量的风险似然性外观,影响和监测48个商业建设项目的影响和意义及其可行性。原始技术,财务和组织可行性研究符合严格的银行投资监督要求,由作者在2005年期间执行? 2018.融资和执行专业准备的建筑项目评估方法已被定制出来?技术文件,安排,实现。对银行投资监管的分析和评估由项目执行计划PEP,岩土和环境条件,允许地方当局的设计,协议和决定影响,建筑工程工程合同,项目保险和履约债券,执行任务时间表及其成本,付款计划,投资预算和项目经济效率,每月建设工作的范围通过赚取的价值法评估和建设项目的切换程序评估。尝试在数字上表达风险影响与其可能性水平之间的关系。此外,一种将项目影响的方法存在风险的影响力对项目风险发生的可能性的影响,这使得能够确定这种关系的方向和力量。最后,确定了在蓬勃发展的投资行业持续两年内商业建设项目的出现风险外观,影响和重要性变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号