首页> 外文期刊>Advances in civil engineering >Phenomenon and Critical Conditions of Chamber Soil Sliming during EPB Shield Tunneling in Water-Rich Weathered Diorite: Case Study of Jinan Metro, China
【24h】

Phenomenon and Critical Conditions of Chamber Soil Sliming during EPB Shield Tunneling in Water-Rich Weathered Diorite: Case Study of Jinan Metro, China

机译:富含水富风化Diorite的EPB盾构隧道煤层碎片现象和临界条件:济南地铁案例研究

获取原文
           

摘要

The sliming problem of chamber soil is caused by excessive groundwater seeping into the pressure chamber when an Earth pressure balance shield tunnels through a water-rich weathered rock stratum under semiopen under-pressure mode. As a solution to this problem, a calculation model was established based on field measurements of the discharged soil properties, the seepage water volume, and the seepage path in Jinan Metro, China. Chamber soil sliming is a phenomenon in which chamber soil is in a thin mud state, with no pressure balance in the pressure chamber of the EPB shield and an excessive water content of the chamber soil owing to the continuous seepage of groundwater into the chamber. The chamber pressure is relatively low, which is different from the phenomenon of spewing when the chamber pressure is relatively high. A large amount of water seepage from the stratum around the tunnel excavation surface and shield to the chamber is a significant factor leading to chamber soil sliming during the construction process. It was considered that when the moisture content of the chamber soil, w, is 2wL?≤?w?≤?3wL, slight chamber soil sliming may occur, whereas when w?≥?3wL, serious chamber soil sliming may occur. Moreover, some measures to prevent and control the occurrence of chamber soil sliming were discussed. Controlling the advancing time and the permeability coefficient of chamber soil during construction is the most effective measure to avoid the phenomenon of soil sliming.
机译:腔室土的疏浚问题是由于在半开欠压模式下通过水富有的风化岩石层渗入压力室的过度地下水引起的。作为解决这个问题的解决方案,基于济南地铁济南地铁的渗流水分,渗流水量和渗流路径建立了计算模型。室内土壤碎片是一个现象,其中腔室土壤处于薄泥状态,在EPB屏蔽的压力室中没有压力平衡,由于地下水的连续渗出到腔室中,腔室土的过度含水量。腔室压力相对较低,这与当腔室压力相对较高时的喷射现象不同。从隧道挖掘表面周围的地层渗出的大量水渗出,屏蔽到腔室是在施工过程中导致腔室碎片的显着因素。考虑到腔室土壤W的水分含量为2wl?≤≤w≤≤≤≤≤≤≤≤≤≤≤x≤≤≤≤x≤≤≤≤≤≤≤x≤≤x≤≤≤≤≤x≤≤x≤Δ3wl,而当w?≥3wl时,可能发生严重的室内土壤碎片。此外,讨论了一些预防和控制腔室碎片碎片发生的措施。控制施工过程中腔室土的推进时间和渗透系数是避免土壤碎片现象的最有效措施。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号