...
首页> 外文期刊>SN Applied Sciences >Effect of blast loading and resulting progressive failure of a cable‑stayed bridge
【24h】

Effect of blast loading and resulting progressive failure of a cable‑stayed bridge

机译:爆破载荷的影响,由斜拉桥逐步失效

获取原文
获取原文并翻译 | 示例

摘要

Many researchers have carried out experimental and numerical investigations to examine building structures’ responseto explosive loads. Studies of bridges subjected to blast loads are limited. Hence, in this study, we present a case study ona cable-stayed bridge, namely, Charles River Cable-Stayed Bridge-Boston, to assess its robustness and resistance againstthe progressive collapse resulting from localized failure due to blast loads. Three different blast scenarios are consideredto interpret the bridge performance to blast loads. To monitor the progressive failure mechanisms of the structural elementsdue to blast, pre-defined plastic hinges are assigned to the bridge deck. The results conclude that the bridge is tooweak to sustain the blast loads near the tower location, and the progressive collapse is inevitable. Hence, to preserve thiscable-stayed bridge from local and global failure, structural components should be more reinforced near the tower location.This case study helps the designer better understand the need for blast resistance design of cable-stayed bridges.
机译:许多研究人员已经进行了实验和数值调查以检查建筑物结构的反应爆炸性负荷。对爆破载荷进行的桥梁的研究有限。因此,在这项研究中,我们提出了一个案例研究一座斜拉桥,即查尔斯河斜拉桥梁 - 波士顿,以评估其坚固性和抵抗力由于爆破载荷而导致的初步崩溃导致局部失败。考虑了三种不同的爆炸情景解释桥接性能的桥接性能。监控结构元素的渐进式故障机制由于爆炸,预定义的塑料铰链被分配给桥甲板。结果得出结论,桥梁也是如此维持塔楼附近的爆破载荷薄弱,逐步崩溃是不可避免的。因此,保留这一点来自本地和全局故障的缆车桥,在塔位置附近应更加加强结构部件。本案例研究有助于设计人员更好地理解缆绳座椅的抗爆炸设计需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号