Electromagnetic Transient Programme has been used to calculate the lightning intruding wave of 550 kV GIS substation. The effects of mode operation, surge impedance and length of cable have been considered in the process of calculation. Besides, the corresponding protection scheme has been proposed on the basis of the results of calculation. Results of the research show that when the system is operating in single-in-single-out way, the voltage intruded into the substation is highest; the bigger of surge impedance for GIS, the higher of the voltage; the overvoltage amplitude decreases with the increase of the length of the cable; the installation of metal oxide arrester (MOA) at the entrance of GIS and the region close to the transformer or using the reactor instead the arrestor at the entrance of GIS can limit the voltage strike on the transformer effectively.
机译:电磁瞬态程序已被用于计算550 kV GIS变电站的闪电侵入波。在计算过程中考虑了模式操作的影响,电缆的长度和电缆长度。此外,已经基于计算结果提出了相应的保护方案。研究结果表明,当系统以单次出差方式运行时,侵入变电站的电压最高; GIS的浪涌阻抗越大,电压越高;过电压幅度随着电缆长度的增加而降低;在GIS的入口处安装金属氧化物避雷器(MOA)和接近变压器的区域或使用反应器,而不是GIS入口处的阻挡器可以有效地限制变压器上的电压冲击。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号