...
首页> 外文期刊>Procedia - Social and Behavioral Sciences >Industrialised Building System Modular System (IBSMS) Organisational Readiness Framework
【24h】

Industrialised Building System Modular System (IBSMS) Organisational Readiness Framework

机译:工业建筑系统模块化系统(IBSMS)组织就绪框架

获取原文
           

摘要

Off-site prefabrication and modern method of construction (MMC) has proven to promote sustainability in the construction industry that improve human sociology, foster economic development and environment stability. Modular construction is an innovation in the Malaysian construction industry. This paper discusses the study on IBSMS Organisational Readiness Framework for modular construction implementation through IBS approach in Malaysia. The study explored and identified the readiness elements and criteria as the main components of the framework. Through the framework, organisations that execute modular construction or IBSMS will be well prepared and ready to execute modular construction efficiently, thus improving Malaysian construction industry.
机译:事实证明,异地预制和现代建筑方法(MMC)可以促进建筑业的可持续发展,从而改善人类社会学,促进经济发展和环境稳定。模块化建筑是马来西亚建筑业的一项创新。本文讨论了有关通过IBS在马来西亚实施模块化建筑的IBSMS组织准备框架的研究。该研究探索并确定了准备就绪要素和标准是框架的主要组成部分。通过该框架,执行模块化建筑或IBSMS的组织将做好充分准备,并准备有效地执行模块化建筑,从而改善马来西亚的建筑业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号