Assessing Risk Management Maturity of Construction Organisations on Infrastructural Project Delivery in Nigeria

机译:评估尼日利亚基础设施建设项目施工组织的风险管理成熟度

获取原文
           

摘要

Assessing risk management capability (RMC) of contractors prior to their selection for a project would contribute significantly to project successful delivery. This paper assessed current RMC of Federal highway projects contractors in Nigeria. The study involves review of literatures and questionnaire survey of eighteen rehabilitation projects across Southwest of Nigeria. Maturity levels of the contractors were assessed on four level scale using Fuzzy set theory. The result suggested that overall risk management maturity level of the contractors is ‘novice’. It also indicated maturity levels of contractors on different RMC attributes and provides additional decision support information for selecting winning bid.
机译:在选择承包商之前,评估承包商的风险管理能力(RMC)将大大有助于项目的成功交付。本文评估了尼日利亚联邦公路项目承包商目前的RMC。该研究涉及尼日利亚西南部18个康复项目的文献综述和问卷调查。承包商的成熟度水平使用模糊集理论在四个级别上进行评估。结果表明,承包商的整体风险管理成熟度为“新手”。它还指示了不同RMC属性的承包商的成熟度,并提供了其他选择中标的决策支持信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号