首页> 外文期刊>Procedia - Social and Behavioral Sciences >Simulation-based Time-space Management of Workzone Construction Scheduling. Application in the Korinth-Patras Motorway
【24h】

Simulation-based Time-space Management of Workzone Construction Scheduling. Application in the Korinth-Patras Motorway

机译:基于仿真的工作区施工计划的时空管理。在Korinth-Patras高速公路上的应用

获取原文
       

摘要

Work-zone management is a major safety concern in road construction projects and while established guidelines exist for other countries (e.g. the US and Germany), there is a lack of practical experience in Greece. At the same time, the large number of new major road infrastructure projects require that motorway enhancement takes place while the safe operation of traffic is maintained. Constructability is an important aspect, which becomes more pressing in light of the public-private partnership (PPP) nature of these projects. In this paper, a simulation-based approach for the management of workzone construction scheduling for the Korinth-Patras motorway is presented. The simulation results are used to develop a number of guidelines that are tailored to Greek motorways and can be used for time-space scheduling of work-zones. ? 2011 Published by Elsevier Ltd.
机译:工作区管理是道路建设项目中的主要安全问题,尽管其他国家(例如美国和德国)已经建立了既定的准则,但希腊缺乏实践经验。同时,大量新的主要道路基础设施项目要求在保持交通安全运营的同时进行高速公路的改善。可建设性是一个重要方面,鉴于这些项目的公私伙伴关系(PPP)性质,这变得更加紧迫。本文提出了一种基于模拟的Korinth-Patras高速公路工作区施工进度管理方法。仿真结果用于制定许多针对希腊高速公路的指南,可用于工作区的时空调度。 ? 2011年由Elsevier Ltd.出版

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号