...
首页> 外文期刊>MATEC Web of Conferences >Khartoum sky trains network: a study on implementing caterpillar trains concept in Khartoum
【24h】

Khartoum sky trains network: a study on implementing caterpillar trains concept in Khartoum

机译:喀土穆空中列车网络:在喀土穆实施毛毛虫列车概念的研究

获取原文
           

摘要

The experience of using public transportation in Khartoum is hectic due to over (1.5) Million seats in daily deficit. This research explores the daunting issues of public transport in developing countries like Sudan, taking Khartoum as a case study, and studies the possible alternatives to find an innovative solution that counters them. This paper reviewed the concept presented by MIT scholars in 2017 which was an innovative idea of elevated mini-trains that are intended to run over city streets called (Caterpillar Trains). The paper investigated the use of the C-Trains when integrated with LRT to form the Khartoum Sky Trains Network (STN). It was found that the STN is an optimum model for developing countries, as they were found able to meet the demands of public transport, in both short term and long term. The expected various environmental, social and economic impacts of such large infrastructure project were also studied. Finally, the research suggests that the Build-Operate-Transfer (BOT) contracting module can be utilized to overcome the construction costs, the concession period of which was found through a FORTRAN95 program.
机译:由于每日赤字超过(1.5)百万个席位,因此在喀土穆使用公共交通的经验很忙。这项研究以喀土穆为例,探索了苏丹等发展中国家公共交通的艰巨问题,并研究了可能的替代方案,以找到与之对立的创新解决方案。本文回顾了麻省理工学院学者在2017年提出的概念,这是一种旨在在称为``卡特彼勒火车(Caterpillar Trains)''的城市街道上行驶的高架微型火车的创新想法。本文研究了将C火车与LRT集成在一起以形成喀土穆空中火车网络(STN)的用途。人们发现,STN是发展中国家的最佳模型,因为它们能够在短期和长期内满足公共交通的需求。还研究了这种大型基础设施项目对环境,社会和经济的预期影响。最后,研究表明,可以通过建造-运营-转让(BOT)承包模块来克服建造成本,其特许权期限是通过FORTRAN95程序确定的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号