...
首页> 外文期刊>MATEC Web of Conferences >Risk analysis on implementation of road maintenance project with STEPLE method in Badung, Bali
【24h】

Risk analysis on implementation of road maintenance project with STEPLE method in Badung, Bali

机译:巴厘岛巴东采用STEPLE方法实施道路养护项目的风险分析

获取原文

摘要

In the implementation of the road maintenance project always risks arise. These risks have an impact on stakeholders related to the execution of the project, the community of road users and the surrounding environment. These risks need to be studied, managed, and assessed as a risk-mitigation effort for stakeholders. As the case study is the district road maintenance project, in Badung regency of Bali. Descriptive method used in the study. Identification of variable risk used STEPLE (Social, Technology, Economy, Politics, Legal, and Environment) method. The factors STEPLE is identified through literature review and brainstorming, then used as a questionnaire instrument. Respondents are experts involved in road maintenance projects in Badung regency. Risk assessment uses a risk assessment matrix. The results of the study found 36 risks. These risks are identified as dominant from the Technical variable that is 13 risks. Risk assessment found is 6 risks classified as unacceptable, and 30 risk classified as undesirable.
机译:在实施道路养护项目时,总是会出现风险。这些风险会对与项目执行,道路使用者社区和周围环境有关的利益相关者产生影响。需要对这些风险进行研究,管理和评估,以减轻利益相关者的风险。案例研究是在巴厘岛巴东摄政区的区域道路维修项目。研究中使用的描述性方法。使用STEPLE(社会,技术,经济,政治,法律和环境)方法识别可变风险。通过文献综述和集思广益来确定STEPLE因素,然后将其用作问卷调查工具。受访者是在巴东摄政区从事道路养护项目的专家。风险评估使用风险评估矩阵。研究结果发现了36​​种风险。从技术变量即13个风险中可以确定这些风险为主要风险。发现的风险评估为6类风险被归类为不可接受,30种风险被归类为不良。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号