A new method was established to estimate the ultimate load, which is utilized in the assessment of pile test. In the present study twenty five reports of failure test piles (28.5 x 28.5 cm in dimensions, 12 m in depth and the working load was 40 ton) of Um-Alqura Mosque project were studied in according to their loading and settlement. The (mean ± SD) of the pile settlement for each load of all piles studied were determined, and the results obtained were utilized to generate the equation that correlates between the load and settlement using (4th degree polynomial fit graph). The equation obtained was applied to estimate the ultimate load for the maximum settlement (10% of the pile diameter). The estimated ultimate load (130 ton) in the present study was compared with the ultimate load (132 ton), which was determined previously using (Fellenius and Decourt presentation, 2001). The deviation between the ultimate load of the previous and the present method was (1.5%), but the present method depends on two working load, so it saves time and efforts and suitable to implement in the assessment of the test pile.
机译:建立了一种估计极限载荷的新方法,该方法被用于桩身试验的评估中。在本研究中,根据Um-Alqura清真寺项目的载荷和沉降情况,研究了25份报告,其中包括28.5 x 28.5 cm的尺寸,12 m的深度以及40吨的工作载荷的失败测试桩。确定所研究的所有桩的每个荷载的桩沉降的(平均值±SD),并使用(四次多项式拟合图)将所得结果用于生成与荷载和沉降相关的方程。应用获得的方程式估算最大沉降(桩直径的10%)的最终载荷。将本研究中的估计极限载荷(130吨)与以前使用(Fellenius and Decourt Presentation,2001)确定的极限载荷(132吨)进行了比较。前一种方法和本方法的极限载荷之间的偏差为(1.5%),但是本方法取决于两个工作载荷,因此节省了时间和精力,并适合在测试桩的评估中实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号