Residual protection on a wharf structure following application of impressed current cathodic protection

机译:施加外加电流阴极保护后对码头结构的剩余保护

获取原文
           

摘要

Recent studies have suggested that residual protection is afforded to structures following the application of impressed current cathodic protection (ICCP), in some cases for significant periods of time, while others for periods of only a few days. This study reported the findings of the de-activation of a 20 year old ICCP system installed on a 50 year old structure. The ICCP was de-activated for 84 days and the steel potentials at locations on the front pile cap and front wall were monitored via the installed reference electrodes. An adjacent water anode system was also de-activated for 48 hours during the initial de-activation period to observe the impact on the steel potentials. The results showed that out of 42 reference electrodes, 17 achieved a 100 mv decay within 24 hours and 10 had more positive instant off potentials than -150 mV. Furthermore, all displayed a positive shift in potential following deactivation of the ICCP system for a period of time, indicative of residual protection, with 22 displaying this positive shift for the whole 94 days of the trial.
机译:最近的研究表明,在施加外加电流阴极保护(ICCP)之后,可以对结构提供残余保护,在某些情况下需要较长时间,而其他情况下则只有几天。这项研究报告了停用安装在具有50年历史的结构上的具有20年历史的ICCP系统的发现。将ICCP停用84天,并通过安装的参比电极监测前桩帽和前壁位置的钢势。在初始停用期间,相邻的水阳极系统也停用了48小时,以观察对钢电位的影响。结果表明,在42个参比电极中,有17个在24小时内衰减了100 mv,10个正即时关闭电位比-150 mV高。此外,在ICCP系统停用一段时间后,所有人都显示出正向电位变化,这表明存在剩余保护,而在整个试验的94天中,有22人都显示出这种正向变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号