...
首页> 外文期刊>MATEC Web of Conferences >Congestion cost analysis of Condongcatur signalized intersection Sleman, D.I. Yogyakarta using PTV. Vissim 9
【24h】

Congestion cost analysis of Condongcatur signalized intersection Sleman, D.I. Yogyakarta using PTV. Vissim 9

机译:Condongcatur信号交叉口的拥堵成本分析Sleman,D.I.日惹使用PTV。维西姆9

获取原文
   

获取外文期刊封面封底 >>

       

摘要

The congestion cost is one of the most important consideration when congestion happens. One of the most frequent congestion is in the intersection. And one of the intersections in Yogyakarta Special Region is Condongcatur signalized intersection, Sleman. This study aims to analyze the congestion cost of intersection by using PYV. Vissim 9 as a traffic microsimulation model. For the congestion costs, the author uses Tzedzakis, 1998 approach. The results show that in the existing condition, the average delay is 103.72 determining Vehicle Operating Cost (BOK), Existing Speed is 70 km/H for primary road and 60 km /H for secondary road, travel time value is KB : Rp. 4.970, KR: Rp. 1.925, and SM : Rp. 315. Therefore, the total congestion cost is Rp. 5.663.790, -/hour.
机译:发生拥塞时,拥塞成本是最重要的考虑因素之一。十字路口是最常见的拥堵之一。日惹特别地区的十字路口之一是Condongcatur信号交叉口Sleman。本研究旨在利用PYV来分析交叉口的拥堵成本。 Vissim 9作为流量微仿真模型。对于拥堵成本,作者使用Tzedzakis,1998年的方法。结果表明,在现有条件下,确定车辆运营成本(BOK)的平均延迟为103.72,主要道路的现有速度为70 km / H,次要道路的现有速度为60 km / H,行驶时间值为KB:Rp。 4.970,KR:Rp。 1.925,SM:Rp。 315.因此,总拥塞成本为Rp。 5.663.790,-/小时。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号