首页> 外文期刊>MATEC Web of Conferences >Causes of delay on highway construction projects in Thailand
【24h】

Causes of delay on highway construction projects in Thailand

机译:泰国高速公路建设项目延误的原因

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Delay in construction project is an important issue in construction management. This is because delay will cause negative impacts on both the owner and the contractor. For owner, it will lead to the late opening of new road. For contractor, it will cause extra operating cost. In this paper, therefore, the causes of delay in road construction projects are researched. This paper studied a list of road construction delay causes gathered from literature having different countries. Internationally, twenty-six factors that might cause delays of road construction projects are identified in this research. Among 26 factors, considering in Thailand, eight key factors are typically found as the cause of delays in road construction projects. These 8 factors are then prioritized to identify the most important causes of delays in road construction projects in Thailand. A questionnaire and personal interviews through project engineer have formed the basis of this paper. The study indicates that the 5 top factors affecting road construction delays are: incomplete drawings, lack of equipment efficiency or financial status of contractors, delay in relocating existing infrastructure structures, less of project engineer experiences, and delay in relieving environmental impact, respectively.
机译:建设工程延误是建设管理中的重要问题。这是因为延迟将对所有者和承包商造成负面影响。对于业主而言,这将导致新路的开放较晚。对于承包商而言,这将导致额外的运营成本。因此,本文研究了道路建设项目延误的原因。本文研究了从不同国家的文献中收集的道路建设延误原因清单。在国际上,本研究确定了可能导致道路建设项目延迟的二十六个因素。在泰国考虑的26个因素中,通常发现八个关键因素是道路建设项目延误的原因。然后优先考虑这8个因素,以确定泰国道路建设项目延误的最重要原因。通过项目工程师进行的问卷调查和个人访谈构成了本文的基础。研究表明,影响道路建设延误的5个主要因素分别是:不完整的图纸,缺乏设备效率或承包商的财务状况,搬迁现有基础设施结构的延误,较少的项目工程师经验以及减轻环境影响的延误。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号