首页> 外文期刊>MATEC Web of Conferences >Optimization of Drainage Schemes for the Dike Strengthening by Warping Construction Project in the Qinhe River under Restricted Drainage Condition
【24h】

Optimization of Drainage Schemes for the Dike Strengthening by Warping Construction Project in the Qinhe River under Restricted Drainage Condition

机译:限制排水条件下沁河整经工程加固堤防排水方案的优化

获取原文
       

摘要

Dike strengthening by warping construction is one of the main construction modes for the standardized dike construction of mainstream and tributaries in the lower reaches of the Yellow River, and whether the drainage in the dike strengthening by warping construction is smooth is closely related to the safety of dike project. Restricted by topographic conditions and construction conditions, existing drainage schemes are not applicable to the Qinhe River (the Yellow River’s largest tributary) Flood Prevention Project Wuzhi Section, which is next to farm cottage. Therefore, in this paper a field test was carried out using three drainage schemes---“L” type PVC seepage drainage pipes through dike, “L” type perforated PVC seepage drainage pipes coated with geotextile and geotextile drainage grilles. The drainage velocity, silt retaining effect, water level in the silt area, dike body deformation and other key indicators were obtained through field monitoring, and the safety and stability of the dike strengthening by warping construction project were verified by numerical calculation. The field test results showed that the drainage effect of the “L” type perforated PVC seepage drainage pipes coated with geotextile and geotextile drainage grilles was obviously better than that of the “L” type PVC seepage drainage pipes through dike, but the geotextile drainage grilles had advantages in silt retaining effect, construction convenience, cost, and improvement. The field test results can provide a reference for the quick drainage design and construction of dike back deposited with silt of the dike strengthening by warping construction project in the Yellow River.
机译:翘曲加固堤防是黄河下游干流和支流标准化堤防建设的主要建设方式之一,翘曲加固堤防排水是否畅通与河段安全有关。堤防工程。受地形条件和施工条件的限制,现有的排水方案不适用于毗邻农舍的秦河(黄河最大支流)防洪工程Wu支段。因此,本文采用三种排水方案进行了现场测试:“ L”型通过堤坝的PVC渗水排水管,“ L”型穿孔的涂有土工织物和土工织物排水格栅的PVC渗水排水管。通过现场监测获得了排水速度,淤泥滞留效果,淤泥区水位,堤防变形等关键指标,并通过数值计算验证了翘曲施工工程加固堤防的安全性和稳定性。现场试验结果表明,涂​​有土工布和土工布排水格栅的“ L”型带孔PVC渗水排水管的排水效果明显好于堤防“ L”型PVC渗水排水管的排水效果,但土工布排水格栅具有保持淤泥效果,施工方便,成本高和改善的优点。田间试验结果可为黄河翘曲建设工程加固堤防淤泥后的堤防快速排水设计和施工提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号