首页> 外文期刊>MATEC Web of Conferences >Two-Sided assembly line balancing to minimize number of workstation with considering the relationships between tasks
【24h】

Two-Sided assembly line balancing to minimize number of workstation with considering the relationships between tasks

机译:两面流水线平衡,通过考虑任务之间的关系来最大程度地减少工作站数量

获取原文
           

摘要

There are many problems in assembly line. Some of the problems are assembly line reliability which relates to maintenance and unbalance workload. As a result, production line is not efficient and production plan is not fulfilled. Previous research on two-sided assembly line balancing problem has proprosed improvement method by considering index relationship between tasks. There are only two factors that is taken into account in this research, they are: distance factor of the implementation of the task (distance factor) and tools used to perform the task (tool factor). Therefore, this paper aims to develops conceptual model by considering additional factors that affecting Assembly Line Tasks Consistency (ATC). The additional factors that are considered are as follow: distance factor, tool factor, motion factor, layout factor, and skill factor. The purpose of this conceptual model is to increase productivity by minimizing number of workstations. Linear combination are used to find a combination solution of a relationship between task to complete a two-sided assembly line balancing problem. Improvement of proposed assembly line are measured according to Balance Delay (BD) and Line Efficiency (LE).
机译:流水线有很多问题。其中一些问题是流水线的可靠性,这与维护和不平衡工作量有关。结果,生产线效率低下,生产计划无法实现。先前关于双面流水线平衡问题的研究提出了一种通过考虑任务之间的索引关系的改进方法。本研究仅考虑两个因素,它们是:任务执行的距离因素(距离因素)和用于执行任务的工具(工具因素)。因此,本文旨在通过考虑影响组装线任务一致性(ATC)的其他因素来开发概念模型。考虑的其他因素如下:距离因素,工具因素,运动因素,布局因素和技能因素。此概念模型的目的是通过最小化工作站数量来提高生产率。线性组合用于查找任务之间关系的组合解,以完成双面装配线平衡问题。根据平衡延迟(BD)和生产线效率(LE)来衡量建议的装配线的改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号