首页> 外文期刊>E3S Web of Conferences >Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects
【24h】

Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects

机译:在实施高层开发项目时,使用系统集成方法在建筑公司内部形成生产结构单元

获取原文
           

摘要

Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew).
机译:开发用于设计未来运营的高效算法是建筑业务中至关重要的元素。本文研究了确定施工人员执行各种与过程相关的工作的集成指标所需的方法的各个方面。本文概述的研究的主要目标是,针对专门执行集成和建造工作的整个施工团队,以找到最佳的组织解决方案,从而定义与之相关的集成人员的概念。目的。从算法元素的顺序可以看出,它被设计为专注于影响施工人员集成水平的关键因素,具体取决于每个元素的价值。多因素建模方法用于评估参与大型高层建筑项目的综合施工人员的KPI。这项研究的目的是为组织和技术性质的发展提供理论建议和科学方法论,以确保在多任务施工阶段的综合实施过程中,定性组建一体化的施工队伍,以提高他们的生产率。提议的解决方案与现有解决方案的主要区别在于,它需要确定每个因素对施工中组织和技术系统中每个单独元素的集成指数的影响程度,包括资格水平的变化。 (综合施工人员)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号