首页> 外文期刊>Journal of Water and Land Development >Conformity evaluation of synthetic unit hydrograph (case study at upstream Brantas sub watershed, East Java Province of Indonesia)
【24h】

Conformity evaluation of synthetic unit hydrograph (case study at upstream Brantas sub watershed, East Java Province of Indonesia)

机译:综合单元水位图的合格评定(印度尼西亚东爪哇省黑雁上游流域的案例研究)

获取原文
           

摘要

This study intends to analyse the suitable hydrograph in upstream Brantas sub watershed. The methodology consists of comparing the result of hydrograph due to the methods of Nakayasu synthetic unit hydrograph (SUH), Limantara synthetic unit hydrograph, and the observed unit hydrograph. In detail, this study intends to know the difference of hydrograph parameters ?± and Tg as recommended by Nakayasu and in the study location; to know the influence of main river length which is used in the methods of Nakayasu and Limantara to the time of concentration; to know the hydrograph ordinate deviation between Nakayasu and Limantara due to the observed hydrograph. Result is hoped for recommending the suitable hydrograph in upstream Brantas subwatershed so that it can be used accurately for the further design of water resources structure.
机译:这项研究旨在分析上游布兰塔斯子流域的合适水文。该方法包括比较由于Nakaayasu合成单位水位图(SUH),Limantara合成单位水位图和观测单位水位图的方法产生的水位图结果。详细地讲,本研究旨在了解Nakaayasu推荐的水文参数α±和Tg的差异以及研究地点。了解Nakaayasu和Limantara方法中使用的主要河流长度对集中时间的影响;知道由于观测到的水文图而导致的Nakaayasu和Limantara之间的水文图坐标偏差。希望结果能推荐出适合于上游Brantas小流域的水文图,以便可以将其准确地用于水资源结构的进一步设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号