PERFORMANCE ANALYSIS OF A WIND TURBINE WITH PERMANENT MAGNET SYNCHRONOUS GENERATOR

机译:永磁同步发电机风轮机的性能分析

获取原文

摘要

This paper presents performance analysis of a 2 kW wind turbine with permanent magnet synchronous generator. The Government of the Republic of Indonesia through the Ministry of Energy and Mineral Resources (ESDM) targets by 2025 of at least 23% of the total national electricity supply comes from renewable energy sources. Government programs must be supported by all regions to help build renewable energy power plants to its potential of each. In this case, the district of Bantul, Yogyakarta Special Region Province, Indonesia, particularly the southern coastal region is very likely to be developed wind power plant. In this research, the create-designing and testing of wind power with maximum capacity of 2 kW is done. The test has been carried out on September 5 and 6, 2016 at the Baru Beach, Srandakan, Bantul. The test results on September 5, 2016 showed that the highest power generator occurred at 12:40 PM is 768.96 watts, with a wind speed of 8.76 m/s, AC voltage of generator is 40.00 volts, the DC voltage generator after rectified be 53.40 volts, and the load current is 14.40 ampere. In this condition, the 2 kW wind turbine has the efficiency of 38.4%. Furthermore, the test results dated 6 September 2016 found that the highest power generator at 10:50 PM is 842.20 watts, with a wind speed 9.53 m/s. At this peak condition resulting AC voltage of generator of 39.00 volts, the DC voltage of 49.60 volts, the load current of 17.00 amperes, and resulting in efficiency of 42.1%. The research results indicate that wind turbine is an alternative solution in the southern coastal region of Bantul for the supply of renewable energy sources.
机译:本文介绍了具有永磁同步发电机的2 kW风力发电机的性能分析。印度尼西亚共和国政府通过能源和矿产资源部(ESDM)的目标,到2025年至少占全国电力供应总量的23%来自可再生能源。所有地区都必须支持政府计划,以帮助各地区建设可再生能源发电厂。在这种情况下,印度尼西亚日惹特别地区省班图尔地区,特别是南部沿海地区极有可能发展风力发电厂。在这项研究中,完成了最大容量为2 kW的风力发电的设计和测试。该测试已于2016年9月5日至6日在班图尔Srandakan的Baru海滩进行。 2016年9月5日的测试结果显示,下午12:40发生的最高发电机功率为768.96瓦,风速为8.76 m / s,发电机的交流电压为40.00伏,整流后的直流电压发电机为53.40。伏,负载电流为14.40安培。在这种情况下,2 kW风力发电机的效率为38.4%。此外,日期为2016年9月6日的测试结果发现,下午10:50时的最高发电机功率为842.20瓦,风速为9.53 m / s。在此峰值条件下,发电机的交流电压为39.00伏,直流电压为49.60伏,负载电流为17.00安培,效率为42.1%。研究结果表明,风力涡轮机是班图尔南部沿海地区可再生能源供应的替代解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号