首页> 外文期刊>Journal of Optimization in Industrial Engineering >?A Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times
【24h】

?A Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

机译:一种多目标模拟退火算法,解决带运输时间的灵活无等待流水车间调度问题

获取原文
           

摘要

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presents a new multi-objective simulated annealing algorithm (MOSA). A set of experimental instances are carried out to evaluate the algorithm by advanced multi-objective performance measures. The algorithm is carefully evaluated for its performance against available algorithm by means of multi-objective performance measures and statistical tools. The related results show that a variant of our proposed MOSA provides sound performance comparing with other algorithms.
机译:本文讨论了一种双目标混合无等待流水车间调度问题,该问题将使制造期和总加权拖延时间最小化,其中我们考虑了阶段之间的运输时间。使用传统方法和优化工具在合理的计算时间内获得此类复杂的大型问题的最佳解决方案非常困难。本文提出了一种新的多目标模拟退火算法(MOSA)。进行了一组实验实例,以通过先进的多目标性能指标对算法进行评估。通过多目标性能指标和统计工具,针对可用算法仔细评估了该算法的性能。相关结果表明,与其他算法相比,我们提出的MOSA的变体提供了良好的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号