...
首页> 外文期刊>Journal of Minerals and Materials Characterization and Engineering >Model for Prediction of the Concentration of Extracted Tin during Leaching of Cassiterite in Potassium Hydroxide Solution
【24h】

Model for Prediction of the Concentration of Extracted Tin during Leaching of Cassiterite in Potassium Hydroxide Solution

机译:氢氧化钾溶液中锡石浸出过程中萃取锡的浓度预测模型

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Model for prediction of the concentration of tin extracted during potassium hydroxide leaching of cassiterite has been derived. The model: A = Nt1.53, indicates that the concentration tin extracted is dependent on the residence time. It was found that the validity of the model is rooted in the expression Log A = Log (Nt1.53). Tin extraction per unit time as obtained from experiment and derived model are 2.6666 and 2.6268 mg/min respectively. The maximum deviation of the model-predicted concentration of dissolved tin from the corresponding concentration obtained from the experiment was found to be less than 8%, which is quite within the acceptable deviation limit of experimental results and hence, impacting about 92% confidence coefficient on the model.
机译:建立了预测氢氧化钾浸出锡石过程中提取锡的浓度的模型。模型:A = Nt1.53,表明提取的锡浓度取决于停留时间。发现模型的有效性源于表达式Log A = Log(Nt1.53)。从实验和衍生模型获得的每单位时间锡提取量分别为2.6666和2.6268 mg / min。发现模型预测的溶解锡浓度与实验获得的相应浓度的最大偏差小于8%,这完全在实验结果的可接受偏差范围内,因此影响了约92%的置信度模型上的系数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号