Project management is one of the most important and poorly understood areas of management. Delays and cost overruns are common in projects such as construction, power generation, defense, software, product development, etc. Project management is affected by problems relating to costing and scheduling. Changes in the design of customer creates costly ripple effects which in turn lead to delay and disruption throughout an entire organization. In most cases, errors made earlier in engineering projects are discovered close to the end which may require costly rework, expediting, overtime, hiring, schedule slippage or reductions in project scope or quality. Poor profitability, loss of market share and reputation, increased turnover of management and workforce, lower productivity and higher costs are some of the effects of such errors. Other consequences include divisive and costly ligation between customers and contractors over responsibility for overruns and delays. This paper describes in brief, the relevance of modeling and simulation in the management of engineering projects with a case study in the oil and gas industry.
机译:项目管理是管理中最重要和最难理解的领域之一。延迟和成本超支在建设,发电,国防,软件,产品开发等项目中很常见。项目管理受成本和进度安排相关问题的影响。客户设计的变更会造成成本高昂的连锁反应,进而导致整个组织的延迟和中断。在大多数情况下,工程项目的早期错误会在接近尾声时发现,这可能需要昂贵的返工,加急,加班,招聘,进度拖延或缩小项目范围或质量。此类错误可能会导致利润不佳,市场份额和声誉丧失,管理人员和员工流失率增加,生产率降低和成本上升。其他后果包括客户和承包商之间因超支和延误责任造成的分歧和代价高昂的纠缠。本文以石油和天然气行业为例,简要介绍了建模和仿真在工程项目管理中的相关性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号