Operations Scheduling of Sugarcane Production Using Classical GERT Method (Part I: Land Preparation, Planting and Preserve Operations)

机译:使用经典GERT方法进行甘蔗生产的作业调度(第一部分:土地整备,种植和保护作业)

获取原文
           

摘要

Analysis and evaluation of agricultural systems use these criteria: energy, economic, agronomy, environmental conservation and time. Because of time importance indicator for reducing timeliness cost, project scheduling techniques are used. Graphical Evaluation and Review Technique (GERT) is widely used as a tool for managing projects. In this research GERT Networks were used and operations scheduling of sugarcane production (land preparation, planting and preserve operations) in Khuzestan province of Iran as a case study was analysed, by using WinQsb software. Critical activities, events and path were determined. The earliest project completion time is 214.03 days. The results show a high potential for operations scheduling of sugarcane production.
机译:农业系统的分析和评估使用以下标准:能源,经济,农学,环境保护和时间。由于时间重要性指标可降低及时性成本,因此使用了项目计划技术。图形评估和审查技术(GERT)被广泛用作管理项目的工具。在这项研究中,使用了GERT网络,并使用WinQsb软件分析了伊朗Khuzestan省的甘蔗生产作业计划(整地,种植和保鲜作业)。确定了关键活动,事件和路径。最早的项目完成时间是214.03天。结果表明,甘蔗生产的作业调度具有很高的潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号