首页> 外文期刊>Agricultural Engineering International: CIGR Ejournal >Operations scheduling of sugarcane production using fuzzy GERT method (part II: preserve operations, harvesting and ratooning)
【24h】

Operations scheduling of sugarcane production using fuzzy GERT method (part II: preserve operations, harvesting and ratooning)

机译:使用模糊GERT方法的甘蔗生产作业调度(第二部分:保存作业,收获和再生)

获取原文
           

摘要

This paper presents a GERT method based on fuzzy theory for solving fuzzy project scheduling of sugarcane production (preserve operations, harvesting and rationing) in Khuzestan province of Iran. In this method, activity duration time and loops, repetition number, and output activities from nodes of network belong to a fuzzy set. First, an analytical approach was proposed to simplify the structure of network. Then, GERT network computations were done based on evaluating nodes. Process outputs were scheduled network and project fuzzy completion time. These outputs were fuzzy numbers and can be analyzed by α- cut. Results prove that the method of using fuzzy numbers and fuzzy relation in project scheduling is a powerful tool to estimate time for agricultural mechanization projects.
机译:本文提出了一种基于模糊理论的GERT方法,用于解决伊朗胡塞斯坦省甘蔗生产的模糊项目调度(保存操作,收获和配给)。在这种方法中,活动持续时间和循环,重复次数以及来自网络节点的输出活动都属于模糊集。首先,提出了一种简化网络结构的分析方法。然后,基于评估节点进行了GERT网络计算。过程输出是计划的网络和项目的模糊完成时间。这些输出是模糊数,可以通过α-割进行分析。结果证明,在项目调度中使用模糊数和模糊关系的方法是估算农业机械化项目时间的有力工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号