首页> 外文期刊>Journal of Civil Engineering and Science >The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure
【24h】

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure

机译:九堡大桥大跨度混合拱梁结构新型增量发射施工技术

获取原文
       

摘要

Hangzhou Jiubao Bridge crosses the Qiantang River with full length of 1855 m, which is the first large river crossing project completely using composite structure in China. The main navigation span, of span arrangement of 3x210 m, uses the continuous hybrid arch-girder structure, with multi-point simultaneously incremental launching construction method. The design scheme comes out an integrated consideration of both structure and construction technology. For the purpose of safe, reliable, efficient and economical construction, tracked incremental launching equipment is especially developed with only one temporary pier considered for the 210 m main arch span during the launching construction. Design scheme of this bridge presents new design philosophy, technology and creativity.
机译:杭州九堡大桥跨越钱塘江,全长1855 m,是中国第一个完全采用复合结构的大型过江工程。主导航跨度为3x210 m,采用连续混合拱梁结构,多点同时增量发射施工方法。设计方案综合考虑了结构和施工技术。为了安全,可靠,高效和经济的施工,特别开发了履带式增量式下水设备,在下水施工期间仅考虑了一个主墩跨度为210 m的临时墩。这座桥的设计方案展现了新的设计理念,技术和创造力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号