Evaluating the Impact of Risk on Contractor’s Tender Figure in Public Buildings Projects in Northern Nigeria

机译:在尼日利亚北部的公共建筑项目中评估风险对承包商标书的影响

获取原文
           

摘要

It has become almost impossible to have projects completed within the initial cost and time in Nigeria; this is as a result of many factors the construction industry is being plagued with ranging from estimating risk to time and cost overruns. The construction industry is widely associated with a high degree of risk and uncertainty due to the nature of its operating heterogeneous environment. The paper aimed at evaluating the impact of estimating risk on contractor’s tender sum with a view of ensuring efficient delivery of projects in the Northern part of Nigeria. A survey was conducted using questionnaire and a total of four headings of risk factors were identified. Research findings showed defects in design, inflation, contractor’s competence and political uncertainty as well as changes in government? had greatest impact on contractor’s tender figure whereas likely trend in wages rates over the period, excessive approval procedure in administration government department, unavailability of sufficient amount of unskilled labor and technical manpower and resources of the company were the most significant factors to be considered by contractors when estimating the pricing risk. The paper recommends that construction professionals should identify and adequately quantify project estimating risk factors. Adding a risk premium to quotation and time estimation has to be supported by governmental owner organizations and other agencies in the local construction sector. Competent contractors should be allowed to tender so as to see the incidence of these estimating risks as an important aspect that requires attention while evaluating contractor’s tender sum.
机译:在尼日利亚,在最初的成本和时间内完成项目几乎变得不可能;这是由于许多因素困扰着建筑业,从估计风险到时间和成本超支。由于建筑行业的异构环境的性质,建筑行业与高度的风险和不确定性有着广泛的联系。该论文旨在评估估计风险对承包商投标金额的影响,以确保在尼日利亚北部高效交付项目。使用问卷进行了调查,总共确定了四个危险因素的标题。研究发现表明设计,通货膨胀,承包商的能力和政治不确定性以及政府的变化方面存在缺陷。对承包商的投标数字影响最大,而该时期内工资率的可能趋势,政府行政部门的过度批准程序,缺乏足够数量的非熟练劳动力以及公司的技术人力和资源是承包商要考虑的最重要因素。在估算定价风险时。本文建议建筑专业人员应识别并充分量化项目估计的风险因素。必须在政府所有者组织和本地建筑部门的其他机构的支持下,为报价和时间估算增加风险溢价。应当让有资格的承包商进行招标,以便将这些估计风险的发生率视为评估承包商的招标金额时需要注意的重要方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号