首页> 外文期刊>Journal of Current Southeast Asian Affairs >Governance Obstacles to Geothermal Energy Development in Indonesia
【24h】

Governance Obstacles to Geothermal Energy Development in Indonesia

机译:印尼地热能源开发的治理障碍

获取原文
           

摘要

Despite having 40 per cent of the world’s potential for geothermal power production, Indonesia exploits less than five per cent of its own geothermal resources. We explore the reasons behind this lagging development of geothermal power and highlight four obstacles: (1) delays caused by the suboptimal decentralisation of permitting procedures to local governments that have few incentives to support geothermal exploitation; (2) rent-seeking behaviour originating in the point-source nature of geothermal resources; (3) the opacity of central government decision making; and (4) a historically deleterious national fuel subsidy policy that disincentivised geothermal investment. We situate our arguments against the existing literature and three shadow case studies from other Pacific countries that have substantial geothermal resources. We conclude by arguing for a more centralised geothermal governance structure.
机译:印尼虽然拥有全球40%的地热发电潜力,但其本身的地热资源却不到5%。我们探究了地热发电滞后发展的原因,并指出了四个障碍:(1)由于许可程序向地方政府的权力下放而导致的延误,而地方政府却缺乏动力来支持地热利用; (2)地热资源点源性质的寻租行为; (3)中央政府决策的不透明性; (4)历史上有害的国家燃料补贴政策,这削弱了地热投资。我们对现有文献和来自其他拥有大量地热资源的太平洋国家的三个影子案例研究提出了反对意见。最后,我们主张建立一个更加集中的地热治理结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号