...
首页> 外文期刊>Dyna >IMPLEMENTATION OF THE MINESIGHT? TOOLS IN THE LAS CUEVAS MINE OF VALE COAL COMPANY IN COLOMBIA
【24h】

IMPLEMENTATION OF THE MINESIGHT? TOOLS IN THE LAS CUEVAS MINE OF VALE COAL COMPANY IN COLOMBIA

机译:实施远见?哥伦比亚瓦莱煤炭公司拉斯库瓦斯矿山中的工具

获取原文

摘要

This paper presents the implementation of the MineSight? tools in a theoretical project based on the Las Cuevas mine. The project relies on conventional modeling, project configuration, deployment, drilling handling and the creation of the geological and block models that make it possible to reliably determine the exploitable mineral resources of interest. An overview of the project is presented along with a theoretical case study beginning with the generation of polygons in sections representing the seams, using the true thickness tool. After this, economic envelopes were presented using the MSOPIT and MSVALP tools, together with some coal mining requirements. Finally, operational pits were designed using the Pit Expansion tool in order to optimally exploit the site and facilitate economic balance throughout the project. Upon finishing this, the Interactive Planner (IP) tool was used to carry out short-term planning.
机译:本文介绍了MineSight的实现。基于Las Cuevas矿山的理论项目中的工具。该项目依赖于常规建模,项目配置,部署,钻探处理以及地质和区块模型的创建,从而可以可靠地确定相关的可开采矿产资源。介绍了该项目的概述以及理论案例研究,首先使用真实厚度工具在代表接缝的部分中生成多边形。此后,使用MSOPIT和MSVALP工具提出了经济指标,并提出了一些煤矿开采要求。最后,使用坑扩展工具设计了操作坑,以最佳地利用场地并促进整个项目的经济平衡。完成此操作后,使用了交互式计划程序(IP)工具来进行短期计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号