...
首页> 外文期刊>HYDRO Nepal: Journal of Water, Energy and Environment >Variation Orders and It's Procedure for Hydropower Construction
【24h】

Variation Orders and It's Procedure for Hydropower Construction

机译:水电建设的变更顺序及其程序

获取原文
   

获取外文期刊封面封底 >>

       

摘要

There is lots of construction going in Nepal, of which hydropower construction is also moving in significant pace. As the design and drawings prepared during development of the hydropower project may not fully reflect the construction situation, due to the different circumstances led by the Employer, Engineer or Contractor working for the Project. It has been observed globally that the design during project preparation in hydropower projects needs revision during implementation; hence the basic understanding of Variation Orders is very important to the hydropower professionals.?HYDRO Nepal JournalJournal of Water Energy and EnvironmentIssue: 21, July, 2017Page: 15-16Upload Date: July 18, 2017
机译:尼泊尔正在进行许多建设,其中水电建设也在迅速发展。由于在水电项目开发过程中准备的设计和图纸可能无法完全反映施工情况,原因是该项目的雇主,工程师或承包商所领导的情况不同。全球观察到,水电项目在项目准备期间的设计在实施过程中需要修改;因此,对水位变化阶跃的基本了解对于水电专业人士非常重要。?HYDRO Nepal Journal水能与环境学报期刊:2017年7月21日第15-16页上传日期:2017年7月18日

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号