Procedure for construction of hydropower station
Procedure for construction of hydropower station
展开▼
机译:水电站建设程序
展开▼
页面导航
摘要
著录项
相似文献
摘要
Including: (a) construction of at least two turbine generator sets in remote areas, including a turbine and a generator connected to the turbine; (b) connecting the turbine in remote areas to form at least one module; (c) transportation of the turbine by means of transport, preferably water vehicles; From your building site to your installation site; and (d) at your installation site, install the module in your installation site through an elevator device and place it in a designated location. In addition, the selection of reservoirs with high and low water level is also introduced.And fixing between at least two fixed and moving structures to control the level of the selected reservoir suitable for the installation of the hydropower station.