首页> 外国专利> Procedure for construction of hydropower station

Procedure for construction of hydropower station

机译:水电站建设程序

摘要

Including: (a) construction of at least two turbine generator sets in remote areas, including a turbine and a generator connected to the turbine; (b) connecting the turbine in remote areas to form at least one module; (c) transportation of the turbine by means of transport, preferably water vehicles; From your building site to your installation site; and (d) at your installation site, install the module in your installation site through an elevator device and place it in a designated location. In addition, the selection of reservoirs with high and low water level is also introduced.And fixing between at least two fixed and moving structures to control the level of the selected reservoir suitable for the installation of the hydropower station.
机译:包括:(a)在偏远地区至少建造两个涡轮发电机组,包括一个涡轮机和与该涡轮机相连的发电机; (b)在偏远地区连接涡轮机,以形成至少一个模块; (c)通过运输工具,最好是水上交通工具运输涡轮机;从您的建筑工地到您的安装工地; (d)在您的安装地点,通过电梯设备将模块安装在您的安装地点,并将其放置在指定的位置。此外,还介绍了高水位和低水位水库的选择,并在至少两个固定和移动结构之间固定以控制所选水库的水位,以适合水电站的安装。

著录项

  • 公开/公告号PE20030778A1

    专利类型

  • 公开/公告日2003-11-06

    原文格式PDF

  • 申请/专利权人 VA TECH HYDRO GMBH AND CO.;

    申请/专利号PE200320030000

  • 发明设计人 PANHOLZER HEINRICH;

    申请日2003-01-06

  • 分类号F03B13/10;

  • 国家 PE

  • 入库时间 2022-08-22 00:01:34

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号