Contract Breach and Payment for Environmental Services: A Case from the Kulekhani III Hydroelectric Project in Nepal

机译:合同违约和环境服务付款:以尼泊尔Kulekhani III水电项目为例

获取原文
           

摘要

This study was conducted in 2014. The main objective of this study was to find out the cause of contract breach and Payment for Environmental Services (PES) of Kulekhani III Hydroelectric Project (Kulekhani III HEP). PES is a relatively new concept but it is important as it forces employers, contractors, and local residents of a hydropower project to take a fresh look to support a successful construction effort without causing unnecessary environmental damage. Research findings from responses of local people regarding PES programs, in their respective areas of Kulekhani III Hydroelectric Project have been presented. Hydropower construction is extremely complex works, reliant on a host of individual parties and processes to come together to bring a project to fruition. In every context of Nepal, there are additional challenges in terms of adhering to contractual terms and negotiating governmental and donor agencies requirements for proper construction of hydropower project. In the first half of this paper, it has been explored as a case study in the form of Kulekhani III HEP to provide a record of many overruns the contractor experienced. The project became delayed. There were many causes behind the project delay of Kulekhani III HEP. However, permit for tree clearance for access road and untimely payment for contractors are the major ones. HYDRO Nepal Journal Journal of Water, Energy and Environment Issue: 19 Page: 38-44
机译:这项研究于2014年进行。该研究的主要目的是找出Kulekhani III水电项目(Kulekhani III HEP)违反合同和环境服务付款(PES)的原因。 PES是一个相对较新的概念,但它很重要,因为它会迫使水电项目的雇主,承包商和当地居民焕然一新,以支持成功的建设工作而不会造成不必要的环境破坏。已经介绍了当地人对库莱哈尼三世水电项目各自地区的PES计划的回应。水电建设是一项极其复杂的工程,依赖于众多各方和流程的共同努力才能使项目取得成果。在尼泊尔的每种情况下,在遵守合同条款以及就水电项目的适当建设谈判政府和捐助机构的要求方面,都面临着其他挑战。在本文的上半部分,以Kulekhani III HEP的形式作为案例研究进行了探讨,以提供承包商经历的许多超支的记录。该项目被推迟。 Kulekhani III HEP项目延期的背后原因有很多。但是,主要的许可包括通行道路的树木清除许可证和承包商的不及时付款。 HYDRO Nepal Journal水,能源与环境学报发行:19页:38-44

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号