Stormwater Field Evaluation and Its Challenges of a Sediment Basin with Skimmer and Baffles at a Highway Construction Site

机译:公路施工现场含撇渣器和挡板的沉淀池的雨水场评价及其挑战

获取原文
           

摘要

A field-scale data collection plan to monitor and evaluate the performance of a sediment basin design was developed and implemented using portable automatic stormwater samplers, flow modules, a rain gauge, and inflow weirs. The design configuration consisted of a skimmer as the primary dewatering device, three coir baffles installed inside the basin, polyacrylamide flocculant blocks and ditch checks in the inflow channel. A sediment basin built on a highway construction site in Franklin County, Alabama, U.S. using the aforementioned design configuration was monitored over 16 rainfall events from 15 November 2011 to 6 February 2012. The basin effectively removed sediments during the early stages of construction when the correct type of polyacrylamide flocculant blocks was used, e.g., 97.9% of sediment removal after a rainfall event on 16 November 2011. It is difficult and challenging to dose sediment-laden stormwater inflow with an exact amount of flocculating agent across all runoff producing events since rainfall is a stochastic variable. Based upon results from this study, it is recommended that a minimum volume of 251.9 m3/ha of contributing drainage area be used to sufficiently size a basin, which is still significantly under-designed for a 2-year, 24-h storm event in the southeast. This paper presents challenges and lessons learned regarding sediment basin design, monitoring, and performance that are beneficial to future studies.
机译:使用便携式自动雨水采样器,流量模块,雨量计和入水堰,制定并实施了一个现场规模的数据收集计划,以监测和评估沉积物池设计的性能。设计配置包括一个撇油器作为主要的脱水设备,在水池内部安装了三个椰壳挡板,聚丙烯酰胺絮凝剂块和流入通道中的沟渠检查。使用上述设计配置,在美国阿拉巴马州富兰克林县的高速公路建设工地上建造的沉淀池,从2011年11月15日至2012年2月6日发生了16次降雨事件。在正确的施工早期,该池有效地清除了沉积物。使用类型为聚丙烯酰胺的絮凝剂块,例如,在2011年11月16日的一次降雨事件后,沉淀物的去除率为97.9%。在降雨之后的所有径流产生事件中,要给含泥沙的雨水流入量和精确量的絮凝剂进行计量是困难且具有挑战性的是随机变量。根据这项研究的结果,建议使用最小排水面积为251.9 m 3 / ha的排水面积来充分设计水池的尺寸,但对于2年,东南部发生24小时暴风雨事件。本文介绍了有关沉积池设计,监测和性能方面的挑战和经验教训,这些经验教训对将来的研究很有帮助。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号