首页> 外文期刊>Transport >Selection of coal transportation mode from the open pit mine to the thermic power plant using Fuzzy Analytic Hierarchy Process
【24h】

Selection of coal transportation mode from the open pit mine to the thermic power plant using Fuzzy Analytic Hierarchy Process

机译:运用模糊层次分析法选择露天矿到热电厂的输煤模式。

获取原文
       

摘要

Coal produced in open pit mines should be moved to thermic power plants for production of power. Thermic power plants require very large amounts of coal. In transportation process of this coal, both costs and technical parameters should be considered. Common alternative transportation modes in this process are belt conveyors, truck types, suspension rail conveying systems, pipelines and railways. Selection of one of these modes is influenced by transportation distance, inclination of the haulage road, amount of coal reserve, investment costs, production capacity and unit production cost of the open pit mine. In this study, advantages and disadvantages of alternative transportation modes are analysed using Fuzzy Analytic Hierarchy Process (F-AHP). The results revealed, belt conveyors and trucks transportation by are superior to others. First published online 12 April 2017.
机译:露天煤矿产生的煤炭应移至热电厂发电。火力发电厂需要大量的煤炭。在这种煤炭的运输过程中,应同时考虑成本和技术参数。在此过程中,常见的替代运输方式是带式输送机,卡车类型,悬挂式轨道输送系统,管道和铁路。这些模式之一的选择受运输距离,运输道路的倾斜度,煤炭储备量,投资成本,露天矿的生产能力和单位生产成本的影响。在这项研究中,使用模糊层次分析法(F-AHP)分析了替代运输方式的优缺点。结果显示,皮带输送机和卡车的运输均优于其他。首次在线发布于2017年4月12日。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号