...
首页> 外文期刊>Procedia CIRP >Outcome-based Contracts – Towards Concurrently Designing Products and Contracts
【24h】

Outcome-based Contracts – Towards Concurrently Designing Products and Contracts

机译:基于结果的合同–旨在同时设计产品和合同

获取原文

摘要

Outcome-based contracts that pay for effectiveness and penalize performance shortcomings have been introduced to incentivize cost reduction efforts on the contractor side of product service systems (PSSs). Outcome-based contracting concepts are being used for PSS acquisitions in healthcare, energy, military systems and infrastructure. These contracts allow customers to pay only for the specific outcomes achieved (e.g., availability) rather than the workmanship and materials delivered. Given the rise in interest in outcome-based contracts, it is incumbent upon the through-life engineering services (TES) community to determine how to design systems (including designing the sustainment of systems) to operate under these contract mechanisms, and to ultimately coordinate the system design with the design of the contract terms. Furthermore, sustainment decisions made under outcome-based contracts must target the optimum action for the population of systems managed under the contract, rather than the optimum action for an individual system. Today, outcome-based contract design is always performed separate from the engineering and TES design processes, and provided as a requirement to the design process, an approach that creates significant risks for all parties. For systems managed under outcome-based contracts, contract failure may mean significant money is spent by the customer (potentially the public) for either no outcome or inadequate outcome, or result in the contractor being driven out of business, which can lead to disaster for both parties.
机译:为了提高产品服务系统(PSS)的承包商方的成本削减力度,引入了以结果为基础的合同,该合同要为有效性付出代价并弥补绩效缺陷。基于结果的合同概念被用于医疗保健,能源,军事系统和基础设施中的PSS采购。这些合同只允许客户为实现的特定成果(例如可用性)付款,而不是为交付的工艺和材料付款。鉴于对基于结果的合同的兴趣增加,整个生命周期的工程服务(TES)社区有责任确定如何设计系统(包括设计系统的维护)以在这些合同机制下运行,并最终进行协调系统设计与合同条款的设计有关。此外,根据基于结果的合同做出的维持决策必须针对针对合同管理的系统总体的最佳行动,而不是针对单个系统的最佳行动。如今,基于结果的合同设计始终与工程和TES设计过程分开进行,并作为设计过程的要求提供,这种方法会给所有各方带来重大风险。对于根据结果合同进行管理的系统,合同失败可能意味着客户(可能是公众)花费大量金钱,而没有结果或结果不足,或者导致承包商被迫停业,这可能导致灾难性的后果。双方。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号