Co-generation potentials of municipal solid waste landfills in Serbia

机译:塞尔维亚城市固体垃圾填埋场的热电联产潜力

获取原文
           

摘要

Waste management in the Republic of Serbia is based on landfilling. As a result of such year-long practice, a huge number of municipal waste landfills has been created where landfill gas has been generated. Landfill gas, which is essentially methane (50-55%) and carbon dioxide (40-45%) (both GHGs), has a great environmental impact which can be reduced by using landfill gas in cogeneration plants to produce energy. The aim of this paper is to determine economic and environmental benefits from such energy production. For that purpose, the database of cogeneration potentials (CP) of 51 landfills in the Republic of Serbia (RS) was created. Amount of landfill gas generated at each municipal landfill was calculated by applying a first order decay equation which requires the data about solid waste production and composition and about some landfill characteristics. For all landfills, which have over 100,000 m3 each, a techno-economic analysis about building a CHP plant was conducted. The results have shown, that the total investment in 14 CHP plants with payback period of less than 7 years amounts € 11,721,288. The total nominal power of these plants is 7 MW of electrical power and 7.9 MW of thermal power, and an average payback period is about 61 months. In addition, using landfill biogas as energy source in proposed plants would reduce methane emission for 161,000 tons of CO2 equivalent per year. [Projekat Ministarstva nauke Republike Srbije, br. III 42013: Research of cogeneration potential of municipal and industrial energy power plant in Republic of Serbia and opportunities for rehabilitation of existing and construction of new cogeneration plants].
机译:塞尔维亚共和国的废物管理以填埋为基础。经过一年的实践,大量的城市垃圾填埋场产生了填埋气。垃圾填埋气主要是甲烷(50-55%)和二氧化碳(40-45%)(均为温室气体),具有很大的环境影响,可通过在热电联产厂中使用垃圾填埋气来生产能源来减少这种影响。本文的目的是确定此类能源生产的经济和环境效益。为此,创建了塞尔维亚共和国(RS)51个垃圾填埋场的热电联产潜力数据库。每个城市垃圾填埋场产生的垃圾填埋气量是通过应用一阶衰减方程来计算的,该方程需要有关固体废物产生和组成以及某些垃圾填埋场特征的数据。对于每个垃圾填埋场都超过100,000立方米的填埋场,进行了关于建设热电联产厂的技术经济分析。结果表明,投资回收期少于7年的14家热电联产厂的总投资为11,721,288欧元。这些工厂的总标称功率为7兆瓦的电力和7.9兆瓦的火力,平均投资回收期约为61个月。此外,在拟建工厂中使用垃圾填埋沼气作为能源将每年减少甲烷排放量,相当于161,000吨二氧化碳当量。 [Projekat Ministarstva nauke Republike Srbije,br。 III 42013:研究塞尔维亚共和国的市政和工业能源发电厂的热电联产潜力,以及恢复现有和建设新的热电发电厂的机会]。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号