The overall project schedule is the basement of construction project. Any problem in it will cause huge economicloses, and it must be checked before being implemented. This paper introduces real value into DSM (design structurematrix), proposes a new checking and sorting method, and designs detailed processes and rules. Additionally the effectivenessof the method is proved through applying it to an example.
展开▼