...
首页> 外文期刊>Proceedings >Karst Detection, Prevention and Correction: A Case Study along the Riyadh Metro Line 3 (Saudi Arabia)
【24h】

Karst Detection, Prevention and Correction: A Case Study along the Riyadh Metro Line 3 (Saudi Arabia)

机译:喀斯特探测,预防和纠正:以利雅得地铁3号线(沙特阿拉伯)为例

获取原文
           

摘要

In the framework of the largest urban-transit system ever built from scratch, the Riyadh Metro Project (6 lines totaling 176 km), a comprehensive investigation was carried out for karst detection, prevention and correction. This case study of the Metro Line 3 (41.6 km) seeks to show how the multi-technique geophysical survey (seismic refraction, electrical resistivity and ground penetration radar down to 40a??50 m depth) was found to be a successful tool in detecting karst features. Preventive measures included systematic probing drilling to anticipate karst cavities below foundations (653 piers) and tunnel lining evaluation using 2D finite elements. Finally, this paper provides initial guidance of the corrective techniques used for each engineering challenge, such as cavity filling with grouting, geogrid reinforcement, etc.
机译:在有史以来最大的城市交通系统框架内,利雅得地铁项目(6条线,总长176公里)进行了全面调查,以发现,预防和纠正喀斯特。此地铁3号线(41.6公里)的案例研究旨在展示如何发现多种技术的地球物理勘测(地震折射,电阻率和低至40a ?? 50 m深度的地面穿透雷达)是成功检测地震的工具岩溶特征。预防措施包括系统探测钻探以预测地基(653个墩)以下的岩溶腔,并使用2D有限元评估隧道衬砌。最后,本文提供了针对每个工程难题的纠正技术的初步指南,例如,灌浆,土工格栅加固等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号