首页> 外文期刊>PCI journal >Splicing Precast Prestressed Concrete Piles
【24h】

Splicing Precast Prestressed Concrete Piles

机译:拼接预制预应力混凝土桩

获取原文
获取外文期刊封面目录资料

摘要

align="left">The Boston Edison Company in Everett, Massachusetts, was looking for an economical, easy-to-use yet strong splice for precast prestressed concrete piles. The company decided to use a splicing? technique that was originally developed in Sweden. Because there is a 60 ft (18.3 m) maximum length allowed on the highways in Sweden, it was imperative that a reliable splicing technique be developed in that country. Indeed, most concrete piles in Sweden are spliced. Swedish contractors, therefore, prefer to purchase smaller, less costly equipment while investing more money in shorter piles and quality splices.? In their opinion, the piles and splices are what is important, and they should be easy to use at the job site.
机译:align =“ left”>位于马萨诸塞州埃弗里特的波士顿爱迪生公司正在寻找一种经济,易于使用但坚固的预制预应力混凝土桩的接头。公司决定采用拼接方式吗?最初在瑞典开发的技术。由于瑞典高速公路上允许的最大长度为60英尺(18.3 m),因此必须在该国开发一种可靠的拼接技术。实际上,瑞典的大多数混凝土桩都是拼接而成的。因此,瑞典承包商更倾向于购买更小,成本更低的设备,同时在短桩和优质接头上投入更多资金。他们认为,桩和接头很重要,在工作现场应易于使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号