Precast concrete building system components for the Westin resort hotel, part 2: Design and construction

机译:威斯汀度假酒店的预制混凝土建筑系统组成部分,第2部分:设计和建造

获取原文
   

获取外文期刊封面封底 >>

       

摘要

>The Westin Resort Hotel is an all-precast concrete building that emulates flat-slab, post-tensioned construction. Constructed in Avon, Colo., about 100 mi (160 km) west of Denver, Colo., the project demonstrates that a precast concrete alternative can be constructed in winter conditions on a confined site. The building was completed two weeks ahead of schedule using four basic precast concrete components: elevator and stair cores, columns with integral capitals, beam slabs, and rib slabs. About 3700 precast concrete pieces were required to complete the project. This paper describes the structural concept, alternative details, fabrication, and construction of the building project.>References>1. Pessiki, S., W. van Zyverden, R. Sause, and S. Slaughter. 1997. target="_blank" title="Proposed Concepts for Floor Framing Systems for Precast/Prestressed Concrete Office Buildings." href="http://dx.doi.org/10.15554/pcij.09011997.66.76 ">Proposed Concepts for Floor Framing Systems for Precast/Prestressed Concrete Office Buildings. PCI Journal, V. 42, No. 5  (September-October): pp. 66-76. >2. Hanlon, John, Charles W. Dolan, David Figurski, Jiangang Deng, and J. Gregory Dolan. 2009. target="_blank" title="Precast Concrete Building System Components for the Westin Resort Hotel, Part 1: Experimental  Validation" href="http://dx.doi.org/10.15554/pcij.03012009.84.96 ">Precast Concrete Building System Components for the Westin Resort Hotel, Part 1: Experimental  Validation, PCI Journal, V. 54, No. 2 (Spring): pp. 84-96. >3. PCI Industry Handbook Committee. 2004. PCI Design Handbook: Precast and Prestressed Concrete. 6th ed. Chicago, IL: PCI. 
机译:>威斯汀度假酒店(Westin Resort Hotel)是一栋全预制混凝土建筑,模仿平板,后张法施工。该项目是在科罗拉多州丹佛市以西约100英里(160公里)的科罗拉多州埃文市建造的,证明了可以在冬季条件下在狭窄的场地上建造预制混凝土替代品。该建筑使用四个基本的预制混凝土组件提前两周完工:电梯和楼梯核心,带整体固定装置的圆柱,梁板和肋板。完成该项目需要大约3700个预制混凝土块。本文介绍了建筑项目的结构概念,替代细节,制造和施工。 >参考文献 > 1。佩西基(S. Pessiki),范·兹沃登(W. van Zyverden),索斯(R. Sause)和斯劳特(S. Slaughter)。 1997年。target =“ _ blank” title =“预制/预应力混凝土办公楼地板框架系统的建议概念。” href =“ http://dx.doi.org/10.15554/pcij.09011997.66.76”>用于预制/预应力混凝土办公楼的地板框架系统的建议概念。《 PCI Journal》,第42卷,第5期(9月-10月):第66-76页。 > 2。 Hanlon,John,Charles W.Dolan,David Figurski,Jiangang Deng和J.Gregory Dolan。 2009年。target =“ _ blank” title =“威斯汀度假酒店的预制混凝土建筑系统组件,第1部分:实验性验证” href =“ http://dx.doi.org/10.15554/pcij.03012009.84.96” >威斯汀度假酒店的预制混凝土建筑系统组件,第1部分:实验验证,PCI Journal,V.54,No.2(Spring):第84-96页。 > 3。 PCI行业手册委员会。 2004年。《 PCI设计手册:预制和预应力混凝土》。第六版。伊利诺伊州芝加哥:PCI。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号