...
首页> 外文期刊>Soils and foundations >ON DESIGN OF EXPRESSWAY EMBANKMENT IN SEISMICALLY ACTIVE AREA WITH EMPHASIS ON LIFE CYCLE COST
【24h】

ON DESIGN OF EXPRESSWAY EMBANKMENT IN SEISMICALLY ACTIVE AREA WITH EMPHASIS ON LIFE CYCLE COST

机译:以生命周期成本为重点的地震活动区高速公路路堤设计

获取原文
           

摘要

References(18) Cited-By(2) This paper addresses the role played by life cycle cost (LCC) calculation in a seismic design of geotechnical structures. The recent trend towards the performance-based design is pushed further to arrive at the optimum design by using the LCC principle. Since geotechnical engineering still has many uncertainties in the LCC calculation, consideration and decision were made to solve each of them. As a research product, an example calculation was made of an expressway embankment whose interruption upon a major earthquake would cause significant damage to the economy. The results show that the indirect loss due to the elongated travel time during the interruption is the most significant source of LCC. Accordingly, it was found that the choice of design specification is affected by, whether a conventional seismic design principle is employed or LCC-based principle is made use of.
机译:参考文献(18)(2)本文探讨了生命周期成本(LCC)计算在岩土结构抗震设计中的作用。通过使用LCC原理,进一步推动了基于性能的设计的最新趋势,以达到最佳设计。由于岩土工程在LCC计算中仍存在许多不确定性,因此需要进行考虑和决策以解决它们。作为研究产品,以高速公路路堤为例进行了计算,高速公路路堤在大地震中的中断会严重损害经济。结果表明,由于中断期间旅行时间延长而造成的间接损失是LCC的最重要来源。因此,发现设计规范的选择受采用传统的地震设计原理还是利用基于LCC的原理影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号