首页> 外文期刊>Science Journal of Energy Engineering >An Economic Analysis on the Viability of Harnessing Wind Energy for Power Generation in Kaduna State, Nigeria
【24h】

An Economic Analysis on the Viability of Harnessing Wind Energy for Power Generation in Kaduna State, Nigeria

机译:尼日利亚卡杜纳州利用风能发电的可行性的经济分析

获取原文
           

摘要

This paper presents an economic analysis on the viability of harnessing wind power for power generation in Kaduna State, based on wind data analysis of Kaduna and Zaria. The available wind power density of both Kaduna and Zaria of 246.69 W/m~2 and 296.76 W/m~2 respectively shows that Kaduna and Zaria can harness wind power for power generation at utility scale. How economical this would be in the long run is what this paper seeks to analyse. The one-time cost of planting a 300MW capacity wind turbines in either Kaduna or Zaria was found to be $716,680,000, which does not include the annual variable costs of $17,927,750.2. With the assumption that capital would be loaned from a bank at 7% interest to pay back in 30 years, the annual capital payment is estimated to be $57,754,663.67. Considering capacity factor, line losses, and a total annual costs of $90,121,079.79, the average cost of electricity per kWh was estimated as $0.0909.
机译:本文基于卡杜纳和扎里亚的风能数据分析,对卡杜纳州利用风力发电的可行性进行了经济分析。 Kaduna和Zaria的可用风能密度分别为246.69 W / m〜2和296.76 W / m〜2,表明Kaduna和Zaria可以利用风能在公用事业规模上发电。从长远来看这将是多么经济,这是本文试图分析的。在卡杜纳或扎里亚种植300兆瓦容量风力涡轮机的一次性成本为716,680,000美元,其中不包括年度可变成本17,927,750,2美元。假设资本将从银行借入7%的利息以在30年内偿还,则每年的资本支出估计为$ 57,754,663.67。考虑到容量因素,线路损耗以及每年90,121,079.79美元的总成本,估计每千瓦时的平均电费为0.0909美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号