...
首页> 外文期刊>Remote Sensing >Characterizing and Monitoring Ground Settlement of Marine Reclamation Land of Xiamen New Airport, China with Sentinel-1 SAR Datasets
【24h】

Characterizing and Monitoring Ground Settlement of Marine Reclamation Land of Xiamen New Airport, China with Sentinel-1 SAR Datasets

机译:利用Sentinel-1 SAR数据集表征和监测厦门新机场海垦区地面沉降

获取原文
           

摘要

Artificial lands or islands reclaimed from the sea due to their vast land spaces and air are suitable for the construction of airports, harbors, and industrial parks, which are convenient for human and cargo transportation. However, the settlement process of reclamation foundation is a problem of public concern, including soil consolidation and water recharge. Xiamen New Airport, one of the largest international airports in China, has been under construction on marine reclamation land for three years. At present, the airport has reached the second phase of construction, occupying 15.33 km 2 . The project will last about twenty years. To investigate the temporal and spatial evolution of ground settlement associated with land reclamation, Sentinel-1 synthetic aperture radar (SAR) data, including intensity images and phase measurements, were considered. A total of 82 SAR images acquired by C-band Sentinel-1 satellite covering the time period from August 2015 to October 2018 were collected. First, the spatial evolution process of land reclamation was analyzed by exploring the time series of SAR image intensity maps. Then, the small baseline subset InSAR (SBAS–InSAR) technique was used to retrieve ground deformation information over the past three years for the first time since land reclamation. Results suggest that the reclaimed land experienced remarkable subsidence, especially after the second phase of land reclamation. Furthermore, 26 ground settlement areas (i.e., 0.015% of the whole area) associated with land reclamation were uncovered over an area of more than 1200 km 2 of the Xiamen coastal area from January 2017 to October 2018. This study offers important guidance for the next phase of land reclamation and the future construction of Xiamen New Airport.
机译:人工土地或岛屿因其广阔的陆地空间和空气而被海域开垦,适合于机场,港口和工业园区的建设,这些区域便利了人和货物的运输。然而,填海基础的沉降过程是一个公众关注的问题,包括土壤固结和补给水。厦门新机场是中国最大的国际机场之一,已经在海上填海区建设了三年。目前,该机场已进入建设的第二阶段,占地15.33 km 2。该项目将持续约二十年。为了调查与土地开垦相关的地面沉降的时空变化,我们考虑了Sentinel-1合成孔径雷达(SAR)数据,包括强度图像和相位测量。共收集了C波段Sentinel-1卫星在2015年8月至2018年10月这段时间采集的82张SAR图像。首先,通过探索SAR图像强度图的时间序列,分析了开垦土地的空间演变过程。然后,使用小型基线子集InSAR(SBAS–InSAR)技术,自开垦以来,过去三年来首次检索了地面变形信息。结果表明,开垦后的土地经历了明显的沉降,特别是在第二期土地开垦之后。此外,2017年1月至2018年10月,在厦门沿海地区1200 km 2以上的区域内发现了与土地开垦相关的26个地面定居区(占总面积的0.015%)。下一阶段的土地开垦和厦门新机场的未来建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号