首页> 外文期刊>Nepal Journal of Science and Technology >Wind Energy Resource Assessment and Feasibility Study of Wind Farm in Kaligandaki Riverbank of Mustang District
【24h】

Wind Energy Resource Assessment and Feasibility Study of Wind Farm in Kaligandaki Riverbank of Mustang District

机译:野马地区加里甘达基河岸风能资源评估及风电场可行性研究

获取原文
           

摘要

This study presents wind energy resource assessment and financial analysis of a 15 MW wind farm in Mustang for utility scale power generation. Hourly meteorological data at Kagbeni and Thini measured at 10 m and 20 m height from 2001 to 2005 have been analyzed and annual average wind speed and power density at 75 m above ground level at Kagbeni 8.05 m/s and 851 W/m 2 whereas the same for Thini are 6.99 m/s and 337 W/m 2 respectively.WAsP analysis showed that the wind speed and wind power density in the study area (20 × 20 km 2 ) varied from 2.72 m/s to 44.51 m/s and 0.23 kW/m 2 to 173.27 kW/m 2 . Optimized layout of a 15 MW wind farm that comprised of twenty five S52 -600 kW turbines, developed by open Wind software yields annual gross energy 63.58 GWh, and net energy 41.66 GWh with capacity factor of 31.68 %. The economic analysis of the farm suggests that the unit energy cost stands on range NRs 4.57 to NRs 6.10 under different energy availability scenario to meet the project MARR of 16.1%. Based on the results, it is apparent that the wind resources at Mustang are suitable for harnessing wind energy especially for the purpose of utility scale electricity generation. Site accessibility is a major challenging factor to establish a wind farm currently. Key words: WAsP; wind energy; wind farm DOI: 10.3126jst.v11i0.4139 Nepal Journal of Science and Technology 11 (2010) 159-166
机译:这项研究提出了野马15兆瓦风电场用于公用事业规模发电的风能资源评估和财务分析。分析了2001年至2005年Kagbeni和Thini每小时10 m和20 m高度的每小时气象数据,并在Kagbeni处高于地面的75 m处的年平均风速和功率密度8.05 m / s和851 W / m 2,而WASP分析表明,研究区域(20×20 km 2)的风速和风功率密度从2.72 m / s变化到44.51 m / s,而Thini的风速和风速密度分别为2.99 m / s和337 W / m 2。 0.23 kW / m 2至173.27 kW / m 2。由Open Wind软件开发的由25台S52 -600 kW涡轮机组成的15兆瓦风力发电场的优化布局可产生年总能量63.58 GWh,净能量41.66 GWh,容量系数为31.68%。该农场的经济分析表明,在不同的可用能源情况下,单位能源成本处于NRs 4.57至NRs 6.10范围内,以满足16.1%的项目MARR。根据这些结果,很明显,野马的风能特别适合用于风能发电。站点可访问性是当前建立风电场的主要挑战因素。关键字:WAsP;风能;风电场DOI:10.3126 / njst.v11i0.4139尼泊尔科学技术杂志11(2010)159-166

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号