...
首页> 外文期刊>Engineering >A Study on Physical Model Test for Cheongpyeong Dam Discharge Recalculation
【24h】

A Study on Physical Model Test for Cheongpyeong Dam Discharge Recalculation

机译:清平大坝流量重新计算物理模型试验研究

获取原文

摘要

Cheongpyeong Dam was built in 1943 for the purpose of power generation. Since its construction, discharge flow data based on a theoretical formula have been used to the present times and this leads to a problem of accurate discharge flow information not being available. In particular, Cheongpyeong Dam has been partially repaired and modified to maintain the dam structure over a long period of time and is not being properly reflected with changes at the downstream of the river caused by river improvement projects and sedimentation in reservoir. With a goal to improve Cheongpyeong Dam discharge flow calculation, this study aimed at verifying discharge capability and discharge flow by damper opening in relation to the previously suggested discharge flow through a hydraulic model test based on an accurate reproduction of the dam structure and surrounding topographies as in the present conditions. In this study, a hydraulic model test was conducted to examine the discharge flow of Cheongpyeong Dam. In addition, a comparative examination was carried out against the existing discharge flow proposed using theoretical equations. As a verification of the discharge flow of Cheongpyeong Dam, discharge flows in all sluices and a single sluice were examined. Then, the impact of sluice interference caused by the dam structure consisting with 24 sluices was investigated. As a result of the examination, it was found that the difference between discharge flow calculated using the existing theoretical equations and discharge flow derived from the hydraulic model test was insignificant. Based on the results of hydraulic model test, a formula to estimate stage-discharge flow at a sluice was derived and suggested.
机译:清平水坝始建于1943年,用于发电。由于其构造,基于理论公式的排出流量数据已经被使用到现在,这导致不能获得准确的排出流量信息的问题。特别是清平水坝经过了长期的部分修and和改建,以维持其水坝的结构,但由于河道整治工程和水库中的泥沙淤积,未对河流下游的变化产生适当的反映。为了改善清平水坝的排水流量计算,本研究旨在通过对水坝结构和周围地形进行精确再现的水力模型试验,通过与先前建议的排水流量相关的阻尼器开度来验证排水能力和排水流量。在当前条件下。在这项研究中,进行了水力模型测试,以检查清平水坝的排水流量。此外,对使用理论方程式提出的现有排放流量进行了比较检查。为了验证清平水坝的排水流量,检查了所有水闸和单个水闸的排水流量。然后,研究了由24个水闸组成的坝体结构对水闸干扰的影响。作为检查的结果,发现使用现有理论方程式计算的排出流量与从水力模型试验导出的排出流量之间的差异不明显。基于水力模型试验的结果,推导并提出了估算水闸泄水流量的公式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号