首页> 外文期刊>Engineering >Research on Cost Overrun Risk of Construction Phase of Vietnam Highway International Contracting Project
【24h】

Research on Cost Overrun Risk of Construction Phase of Vietnam Highway International Contracting Project

机译:越南公路国际承包工程建设阶段成本超支风险研究

获取原文
           

摘要

Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the common cost overrun of projects, and the risk factors of it is different in the different countries, different stages and projects types. So in this paper, we generate an evaluation index system of highway construction projects cost overrun risk in Vietnam in the perspective of different project participants, and also evaluate the effects of these factors in method of regression analysis. The empirical results confirmed 7 main factors that have aggravated cost overrun risk in construction stages, e.g. survey and design scheme risk. In final, the corresponding suggestions are proposed to reduce the project cost overrun risk.
机译:最近,越南的公路建设项目迅速增加,其中大多数是国际承包工程。项目共同成本超支对当地政府和企业造成严重的负面影响,其风险因素在不同国家,不同阶段,不同项目类型下是不同的。因此,本文从不同项目参与方的角度,构建了越南公路建设项目成本超支风险评价指标体系,并通过回归分析的方法对这些因素的影响进行了评价。实证结果证实了在施工阶段加剧成本超支风险的7个主要因素,例如:调查和设计方案的风险。最后,提出了相应的建议,以减少项目成本超支的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号