...
首页> 外文期刊>Modern Applied Science >Research on the Optimization Method of Virtual Enterprise’s Task Scheduling Problems in Aluminum Industry
【24h】

Research on the Optimization Method of Virtual Enterprise’s Task Scheduling Problems in Aluminum Industry

机译:铝工业虚拟企业任务调度问题的优化方法研究

获取原文
           

摘要

Traditional research on production scheduling in aluminum industry, aimed to certain production process, simply pursued the output as the highest aim, scheduled based on experience, so that the result of scheduling cannot reach the global optimization, and cannot realize production scheduling and resource allocation with the aim of optimal energy consumption, resulting in the waste of energy. Taken the minimal sum of energy consumption in production, transport and stock as objective function and integrated with enterprise’s experiences in production, the article establishes a model of virtual enterprise’s task scheduling in aluminum industry and a hybrid distributed particle swarm optimization (PSO) algorithm is proposed to solve the problem. Finally, simulation experiment is carried out using industrial data and the result shows the optimized scheduling method has obvious optimal effect on reducing scheduling time, optimizing allocation of resources and so on, and thus the energy saving and consumption reducing purpose are obtained.?
机译:传统的铝工业生产调度研究针对特定的生产过程,仅以经验为基础,以产量为最高目标,因此调度结果无法达到全局最优化,无法实现生产调度和资源分配。最佳能源消耗的目标,导致能源浪费。以生产,运输,库存能耗最小的总和为目标函数,并结合企业的生产经验,建立了铝工业虚拟企业任务调度模型,提出了一种混合分布式粒子群优化算法。解决问题。最后,利用工业数据进行了仿真实验,结果表明,优化的调度方法在减少调度时间,优化资源分配等方面具有明显的最佳效果,从而达到节能降耗的目的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号