In situ gas thermal remediation (GTR) was applied in the pilot study for the first time for remediation of polycyclic aromatic hydrocarbons (PAHs) contaminated soil of a relocated coke plant in Beijing, China. The pilot site squared by 10 m x 10 m was heated by 22 heating wells. Soil temperatures were closely monitored by 5 monitoring wells, and soil vapor were continuously extracted at -10 kPa. With the heating period of 55 days, the temperature of soil in the centre of the site reached above 350 °C, which was higher than temperatures at other monitoring points. Cavities found in two locations negatively affected temperature rising until they were filled up with concrete. In spite of variations of temperatures among monitoring wells, few disparities have been observed on the removal of PAHs, represented by benzo(a)anthracene (BaA), by GTR. The concentration of BaA in soil at entire 3 depths and all sampling points were below the remedial target after GTR. It was demonstrated that a negative-pressure vapor extraction system enabled BaA partitioning into vapor phase at a much lower temperature than its boiling point. This study set a base for application of GTR for remediation of PAHs contaminated sites.
机译:原位气体热修复(GTR)首次用于中国北京搬迁的焦炭厂的多环芳烃(PAHs)污染土壤的修复研究。由22个加热井加热面积为10 m x 10 m的正方形试验区域。通过5口监测井对土壤温度进行了密切监测,并在-10 kPa下连续提取了土壤蒸汽。经过55天的加热,现场中心的土壤温度达到350°C以上,高于其他监测点的温度。在两个位置发现的空腔会对温度升高产生负面影响,直到它们充满混凝土为止。尽管监测井之间的温度变化不大,但在用GTR去除以苯并(a)蒽(BaA)为代表的PAH方面几乎观察不到差异。 GTR后整个3个深度和所有采样点土壤中的BaA浓度均低于补救目标。事实证明,负压蒸气萃取系统能够使BaA在比其沸点低得多的温度下分配为蒸气​​相。这项研究为应用GTR修复PAHs污染部位奠定了基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号