...
首页> 外文期刊>Mathematical Problems in Engineering: Theory, Methods and Applications >The Evaluation of Mineral Resources Development Efficiency Based on Hesitant Fuzzy Linguistic Approach and Modified TODIM
【24h】

The Evaluation of Mineral Resources Development Efficiency Based on Hesitant Fuzzy Linguistic Approach and Modified TODIM

机译:基于犹豫模糊语言和改进TODIM的矿产资源开发效率评价。

获取原文
           

摘要

The evaluation of mineral resources development efficiency is a typical multicriteria decision-making issue. Meanwhile, due to the limited existing technology, there might be subjectivity, ambiguity, and inaccuracy of the measurement of the evaluation index of mineral resources development efficiency. In this paper, we, considering the incomplete information, use the hesitant fuzzy linguistic approach to describe the psychological hesitation and ambiguity of the decision-maker in the actual evaluation process and then construct the general model of the development efficiency evaluation of the mineral resources by using the hesitant fuzzy linguistic terms sets and modified TODIM. Finally, this paper takes the Panxi area as an example to study the development efficiency of vanadium-titanium magnetite. The results show that the hesitant fuzzy linguistic multicriteria decision-making (MCDM) approach can be implemented to mineral resources evaluation and resources management.
机译:矿产资源开发效率评估是一个典型的多标准决策问题。同时,由于现有技术的限制,矿产资源开发效率评价指标的计量可能存在主观性,含糊性和不准确性。本文在考虑信息不完全的前提下,运用犹豫模糊的语言学方法描述了决策者在实际评价过程中的心理犹豫和含糊不清,然后通过以下方法构建了矿产资源开发效率评价的通用模型:使用犹豫的模糊语言术语集和修改的TODIM。最后,以攀西地区为例研究钒钛磁铁矿的开发效率。结果表明,犹豫的模糊语言多准则决策方法可用于矿产资源评价和资源管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号