A Study of Implementation of Preventive Maintenance Programme in Nigeria Power Industry – Egbin Thermal Power Plant, Case Study

机译:尼日利亚电力行业预防性维护计划实施情况研究-埃宾热电厂,案例研究

获取原文
           

摘要

Preventive Maintenance Programme consists of actions that improve the condition of system elements for performance optimization and aversion of unintended system failure or collapse. It involves inspection, servicing, repairing or replacing physical components of machineries, plant and equipment by following the prescribed schedule. It is commonly agreed nowadays that preventive maintenance programme can be very successful in improving equipment reliability while minimizing maintenance related costs. The availability of a complex system, such as steam turbine power plant is strongly associated with its parts reliability and maintenance policy. That policy not only has influence on the parts’ repair time but also on the parts’ reliability affecting the system integrity, degradation and availability. The objective of this paper is to study the effects of Preventive Maintenance Programme (PMP) implementation on the performance of the Egbin 1320 MW thermal power plant in Nigeria. This paper considers the reliability and availability of the 6 x 220 MW steam turbine units installed in the power station. The reliability and availability of the turbines are computed based on a five-year failure database. The availability analysis of available data from 2005 to 2009 shows different results for each unit and variation in availability for different year: availability of unit1 varies between 59.11 to 91.76%; unit 2, 64.02 to 94.53%; unit 3, 28.79 to 91.57%; unit 4, 80.31 to 92.76% and unit 5, 73.38 to 87.76%. Unit 6 was out of service for the past 2 to 3 years. This indicates differences in their systems installation maintenance and operation.
机译:预防性维护计划包括改善系统元​​素条件的操作,以优化性能并避免意外的系统故障或崩溃。它涉及按照规定的时间表进行检查,维修,修理或更换机械,厂房和设备的物理组件。如今,人们普遍认为,预防性维护计划可以非常成功地提高设备可靠性,同时将与维护相关的成本降至最低。诸如蒸汽轮机发电厂之类的复杂系统的可用性与其零件可靠性和维护策略密切相关。该策略不仅影响零件的维修时间,而且影响零件的可靠性,从而影响系统的完整性,性能下降和可用性。本文的目的是研究预防性维护计划(PMP)的实施对尼日利亚Egbin 1320 MW火力发电厂的性能的影响。本文考虑了安装在电站中的6 x 220 MW蒸汽轮机单元的可靠性和可用性。涡轮机的可靠性和可用性基于五年的故障数据库进行计算。对2005年至2009年可用数据的可用性分析显示,每个单元的结果不同,不同年份的可用性也有所不同:unit1的可用性在59.11%到91.76%之间;单元2,64.02至94.53%;第三单元,28.79至91.57%;单元4,80.31至92.76%和单元5,73.38至87.76%。在过去的2至3年中,第6号机组已经停用。这表明它们的系统安装维护和操作有所不同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号